Análisis de factores que inciden en el alcance de los proyectos de infraestructura vial en el departamento de Santander-Colombia.
No Thumbnail Available
Date
2025-03-30
Advisors
Editors
Journal Title
Journal ISSN
Volume Title
Publisher
Corporación Universitaria Minuto de Dios - UNIMINUTO
Type
Trabajo de Investigación e Innovación
Rights
Acceso Abierto - http://purl.org/coar/access_right/c_abf2
Atribución-NoComercial-SinDerivadas 2.5 Colombia
Atribución-NoComercial-SinDerivadas 2.5 Colombia
Abstract
Este proyecto investigado tiene como finalidad identificar y evaluar los factores que inciden en las suspensiones de obras de infraestructura vial (tanto en contratos de obra o de interventoría), enfocado específicamente en los proyectos gestionados por la Gobernación de Santander durante los últimos 4 años de gobierno, dichas suspensiones producen retrasos significativos, incrementos en los costos, y afectan negativamente la conectividad, el desarrollo regional, y la calidad de vida de los habitantes. Los autores estudiaron los factores internos y externos que contribuyen a las suspensiones, con el fin de identificar las variables que repercuten en recursos, tales como problemas de gestión de proyectos, deficiencias en la planificación, retrasos en la financiación, y desafíos en la contratación pública. Por lo anterior se inició con la revisión de la literatura existente sobre gestión de proyectos de infraestructura en el contexto colombiano, considerando marcos normativos, administrativos y financieros que influyen en la ejecución de estas iniciativas, y se analizaron datos históricos de proyectos suspendidos en el Departamento. Para el desarrollo de este estudio, se recurrió al enfoque metodológico basado en el análisis de casos, con el fin de examinar proyectos específicos que han experimentado suspensiones. Se recopilaron y sistematizaron datos históricos, identificando patrones y tendencias que nos permitieran comprender la recurrencia de estos problemas.
The purpose of this research project is to identify and evaluate the factors that influence the suspension of road infrastructure works (both in construction and supervision contracts), specifically focusing on projects managed by the Santander Government during the last 4 years of administration. These suspensions result in significant delays, increased costs, and negatively affect connectivity, regional development, and the quality of life of the residents. The authors studied both internal and external factors that contribute to suspensions in order to identify the variables that impact resources, such as project management issues, deficiencies in planning, delays in financing, and challenges in public procurement. For this purpose, a review of the existing literature on infrastructure project management in the Colombian context was conducted, considering regulatory, administrative, and financial frameworks that influence the execution of these initiatives, and historical data from suspended projects in the department were analyzed. For the development of this study, a methodological approach based on case analysis was used to examine specific projects that have experienced suspensions. Historical data was collected and systematized, identifying patterns and trends that allowed us to understand the recurrence of these issues.
The purpose of this research project is to identify and evaluate the factors that influence the suspension of road infrastructure works (both in construction and supervision contracts), specifically focusing on projects managed by the Santander Government during the last 4 years of administration. These suspensions result in significant delays, increased costs, and negatively affect connectivity, regional development, and the quality of life of the residents. The authors studied both internal and external factors that contribute to suspensions in order to identify the variables that impact resources, such as project management issues, deficiencies in planning, delays in financing, and challenges in public procurement. For this purpose, a review of the existing literature on infrastructure project management in the Colombian context was conducted, considering regulatory, administrative, and financial frameworks that influence the execution of these initiatives, and historical data from suspended projects in the department were analyzed. For the development of this study, a methodological approach based on case analysis was used to examine specific projects that have experienced suspensions. Historical data was collected and systematized, identifying patterns and trends that allowed us to understand the recurrence of these issues.
Description
Analizar los factores que inciden en el alcance de los proyectos de infraestructura vial en el departamento de Santander – Colombia, periodo (2020 – 2024)
Keywords
Dirección de proyecto, Ejecución de proyecto, Infraestructura vial, Proyecto de desarrollo, Project management, Project execution, Road infrastructure, Development project