dc.contributor.advisor |
Mateus Orjuela, Luisa Fernanda |
|
dc.contributor.author |
Correa Rincón, Juan Carlos |
|
dc.contributor.author |
Gordillo, Luisa María |
|
dc.contributor.author |
Farfán, Pedro Rubén |
|
dc.coverage.spatial |
Girardot (Cundinamarca) |
spa |
dc.date.accessioned |
2018-10-17T14:35:12Z |
|
dc.date.available |
2018-10-17T14:35:12Z |
|
dc.date.issued |
2018-05-17 |
|
dc.identifier.citation |
Correa, J., Gordillo, L. y Farfán, P. (2018). Diagnóstico del estado y la geometría puente Salsipuedes en la vía Girardot – Ricaurte -melgar: propuesta de diseño geométrico de acuerdo a las normas nacionales vigentes. (Trabajo de Grado). Corporación Universitaria Minuto de Dios, Girardot- Colombia |
spa |
dc.identifier.uri |
http://hdl.handle.net/10656/6786 |
|
dc.description |
Buscar alternativas de diseño en la parte geométrica para el Puente
Salsipuedes, a través de una investigación de campo y la revisión de la normatividad colombiana vigente. |
spa |
dc.description.abstract |
Colombia es un país en desarrollo, con un gran atraso en la infraestructura, el
Municipio de Girardot no es la excepción donde podemos ver vías en mal estado,
estrechas, que carecen de mantenimiento, así mismo con los puentes vehiculares con
más de medio siglo de construcción, como es el caso del Puente Salsipuedes ubicado
en el K2+040 de la vía que conduce de Girardot a Melgar, puente que presenta
grandes represamientos, bajas velocidades de operación, riesgo en la seguridad vial,
construido hace más de 70 años cumpliendo ya su vida útil, quedando rezagado con
las actuales especificaciones técnicas para la construcción de puentes en vías
principales como es el caso de la vía Girardot – Ricaurte - Melgar.
Razón por la cual como estudiantes de ingeniería civil de la Universidad Minuto
de Dios presentamos el siguiente proyecto que tiene como fin de realizar un
diagnóstico del estado actual de la estructura y presentar alternativa de intervención
con la elaboración de una o varias propuestas de diseño geométrico, con el fin de
garantizar la seguridad vial especialmente para los peatones, ciclistas, y vehículos,
adicionalmente permita generar desarrollo para la región.
El proyecto tiene como alcance realizar un diagnóstico de las condiciones
actuales del puente, mediante investigación de primera y segunda mano revisión
bibliográfica de la historia de los puentes, su evolución, antecedentes nacionales y
regionales, de igual forma mediante técnicas ingenieriles y acuerdo a los manuales de
inspección visual de puentes del INVIAS determinar el estado y cumplimiento de las
normas colombianas vigentes, de igual forma se determinó la resistencia actual del
concreto a través de ensayos de campo, levantamiento topográfico, curvas de nivel,
topografía de detalle, dibujo en software especializado de las condiciones actuales,
simultáneamente se adelantó aforos vehiculares para realizar la clasificación de
vehículos y así proyectar el TPDA para los próximos años, al final del proyecto se
plantea realizar una propuesta de intervención es su parte geométrica, con la
elaboración de planos, estimar un presupuesto de obra y su respectivo cronograma. |
spa |
dc.language.iso |
es |
spa |
dc.publisher |
Corporación Universitaria Minuto de Dios |
spa |
dc.rights.uri |
http://creativecommons.org/licenses/by-nc-nd/2.5/co/ |
|
dc.subject |
Infraestructura |
spa |
dc.subject |
Seguridad vial |
spa |
dc.subject |
Puente |
spa |
dc.subject |
Construcción |
spa |
dc.subject |
Diseño geométrico |
spa |
dc.title |
Diagnóstico del estado y la geometría puente Salsipuedes en la vía Girardot – Ricaurte -melgar: propuesta de diseño geométrico de acuerdo a las normas nacionales vigentes |
spa |
dc.type |
Thesis |
us |
dc.description.abstractenglish |
Colombia is a developing country, with a large backlog in infrastructure, the
Municipality of Girardot is not the exception where we can see roads in poor condition,
narrow, lacking maintenance, likewise with vehicular bridges with more than half a
century of construction, as is the case of the Salsipuedes Bridge located at K2 + 040 of
the road that leads from Girardot to Melgar, a bridge that has large dams, low operating
speeds, road safety risk, built more than 70 years ago and now its useful life, lagging
behind the current technical specifications for the construction of bridges on main roads
such as the Girardot - Ricaurte - Melgar road.
Reason why as students of civil engineering of the University Minute of God we
present the following project that has as purpose to realize a diagnosis of the current
state of the structure and to present alternative of intervention with the elaboration of
one or several proposals of geometric design, In order to guarantee road safety
especially for pedestrians, cyclists, and vehicles, it also allows generating development
for the region.
The project has as a scope to make a diagnosis of the current conditions of the
bridge, through first and second hand research bibliographic review of the history of the
bridges, their evolution, national and regional background, in the same way by
engineering techniques and according to the manuals of visual inspection of bridges of
INVIAS determine the status and compliance of current Colombian standards, in the
same way the current resistance of the concrete was determined through field tests,
topographic survey, level curves, detail topography, drawing in specialized software of
the current conditions, vehicle traffic was simultaneously advanced to carry out the
classification of vehicles and thus project the TPDA for the coming years, at the end of
the project it is proposed to carry out an intervention proposal in its geometric part, with
the preparation of plans, estimate a budget of work and its respective chronog branch. |
us |
dc.rights.license |
Abierto (Texto completo) |
spa |
dc.publisher.department |
Pregrado (Presencial) |
spa |
dc.publisher.program |
Ingeniería Civil |
spa |
dc.type.spa |
Trabajo de Grado |
spa |
dc.source.bibliographicCitation |
Colombia), V. 4. (29 de Septiembre de 2017). Recuperado el 16 de Diciembre de 2017º, de
https://es.wikipedia.org/wiki/V%C3%ADas_4G_(Colombia) |
|
dc.source.bibliographicCitation |
Colombia, C. d. (06 de Agosto de 2002). Ley 769 del 6 de agosto de 2002. Recuperado el 14 de Marzo de
2018, de http://www.conducircolombia.com/codigo.html |
|
dc.source.bibliographicCitation |
Colombia, E. C. (28 de Octubre de 1993). Recuperado el 16 de Diciembre de 2017, de
http://www.alcaldiabogota.gov.co/sisjur/normas/Norma1.jsp?i=304 |
|
dc.source.bibliographicCitation |
construcción, R. i. (04 de Diciembre de 2010). Recuperado el 16 de Diciembre de 2017, de
http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-50732011000100001 |
|
dc.source.bibliographicCitation |
Elrod, J. (01 de Febrero de 2018). Geniolandia. Recuperado el 04 de Marzo de 2018, de
https://www.geniolandia.com/13083367/conceptos-geometricos-que-se-hallan-en-los-puentes |
|
dc.source.bibliographicCitation |
Fernández, C. S. (11 de Noviembre de 2013). Construccion. Recuperado el 22 de Marzo de 2018, de
https://www.patologiasconstruccion.net/2013/11/resistencia-del-hormigon-medianteesclerometro-
2-ensayo-y-valor-fc/ |
|
dc.source.bibliographicCitation |
Ganadero, C. (27 de Enero de 2014). Recuperado el 15 de Diciembre de 2018, de
http://www.contextoganadero.com/agricultura/los-puentes-y-su-importancia-para-laeconomia-
agropecuaria-del-pais |
|
dc.source.bibliographicCitation |
Ibáñez, J. (1992). Recuperado el 16 de Diciembre de 2017, de
https://es.wikipedia.org/wiki/Investigaci%C3%B3n_cualitativa |
|
dc.source.bibliographicCitation |
INVIAS. (26 de Junio de 2015). Recuperado el 16 de Diciembre de 2017, de
https://www.invias.gov.co/index.php/archivo-y-documentos/documentos-tecnicos/3709-
norma-colombiana-de-diseno-de-puentes-ccp14 |
|
dc.source.bibliographicCitation |
LTDA., L. G. (2011). Reflexion sobre nuestros Puentes. Medellin: Escuela Colombiana de Ingeneiria.
(s.f.). Manual De Diseño de Puentes |
|
dc.source.bibliographicCitation |
Moreno, J. E. (19 de Enero de 2018). Pasos seguros para construir un puente. Recuperado el 25 de Enero
de 2018, de https://www.larepublica.co/infraestructura/pasos-seguros-para-construir-unpuente-
2590058 |
|
dc.source.bibliographicCitation |
Ospina, P. M. (11 de Enero de 2017). Recuperado el 16 de Diciembre de 2017, de
https://es.wikipedia.org/wiki/Puente_Mariano_Ospina_P%C3%A9rez_(Girardot) |
|
dc.source.bibliographicCitation |
portafolio.co. (02 de Agosto de 2006). Los caminos de Girardot. Recuperado el 15 de Febrero de 2018,
de http://www.portafolio.co/economia/finanzas/caminos-girardot-201352 |
|
dc.source.bibliographicCitation |
puentes, H. d. (21 de Octubre de 2017). Recuperado el 16 de Diciembre de 2017, de
https://es.wikipedia.org/wiki/Historia_de_los_puentes |
|
dc.source.bibliographicCitation |
ROSSELLI, D. A. (02 de Agosto de 2006). El Tiempo. Recuperado el 22 de Marzo de 2018, de
http://www.eltiempo.com/archivo/documento/MAM-2124046 |
|
dc.source.bibliographicCitation |
Silva., I. A. (05 de Mayo de 2011). Determinando la población y la muestra. Obtenido de
http://tesisdeinvestig.blogspot.com.co/2011/05/definir-la-unidad-de-analisis-y-la.html |
|
dc.source.bibliographicCitation |
Tiempo, R. e. (03 de Febrero de 1996). El Tiempo. PUENTES EN VÍA DE EXTINCIÓN, págs. Version Digital
http://www.eltiempo.com/archivo/documento/MAM-365777. |
|
dc.source.bibliographicCitation |
Uniminuto. (2014). Recuperado el 16 de Diciembre de 2017, de
http://studylib.es/doc/650709/uniminuto-cundinamarca-vicerrector%C3%ADaacad%
C3%A9mica |
|