dc.contributor.advisor |
Paramo Aragon, Jenny Alezandra |
SPA |
dc.contributor.author |
Vásquez Gómez, Deimer |
SPA |
dc.contributor.author |
Homes Cabrera, Falcon Steven |
SPA |
dc.contributor.author |
Navarro Rojas, Ronal Isnardo |
spa |
dc.coverage.spatial |
Girardot (Cundinamarca) |
SPA |
dc.date.accessioned |
2018-09-29T00:41:52Z |
|
dc.date.available |
2018-09-29T00:41:52Z |
|
dc.date.issued |
2017 |
|
dc.identifier.citation |
Vasquez, D; Homes, F; Navarro, R; (2017); Estudio de factibilidad técnica y económica del proceso de ofertas comerciales para la adecuación o nacionalización del servicio eléctrico en la zona oeste de Cundinamarca; (Trabajo de Grado) Corporación Universitaria Minuto de Dios; Girardot - Colombia |
SPA |
dc.identifier.uri |
http://hdl.handle.net/10656/6552 |
|
dc.description |
Desarrollar el estudio de la factibilidad técnica y económica del proceso de ofertas
comerciales para la adecuación o normalización del servicio eléctrico en la zona oeste de
Cundinamarca. |
SPA |
dc.description.abstract |
Este proyecto estudia la situación actual y las principales causas de pérdidas técnicas y comerciales de energía de la empresa eléctrica CODENSA S.A ESP, comercializadora de energía en la zona oeste de Cundinamarca. Debido al alto porcentaje de estas pérdidas presentadas, se plantea una solución que permita la recuperación y facturación de energía, con un estudio de factibilidad técnico-económica por medio de la adecuación o normalización del servicio eléctrico con tiempos de ejecución de obra corta; desde el momento de la notificación por parte de Codensa S.A, ESP hasta la ejecución de la misma.
Para dar cumplimiento a la normatividad eléctrica y disminuir el índice de pérdidas de energía para Codensa S.A, ESP, considerando el aumento de las pérdidas por hurto de energía ya generadas y evidenciadas en los indicadores a Septiembre de 2017 por el departamento de Gestión Control Perdidas; se proponen mejoras en los procesos comerciales, enfocadas en la optimización de recursos y de tiempo, que permitan realizar la adecuación o normalización de una instalación eléctrica, con el fin de identificar las condiciones específicas que debe cumplir el propietario y hacer las correcciones necesarias, para que el operador de red pueda prestar el servicio de aprovisionar energía eléctrica según lo exigido por el RETIE. |
Spa |
dc.language.iso |
es |
SPA |
dc.publisher |
Corporación Universitaria Minuto de Dios |
SPA |
dc.rights.uri |
http://creativecommons.org/licenses/by-nc-nd/2.5/co/ |
|
dc.subject |
Servicio eléctrico |
SPA |
dc.subject |
Control de pérdidas |
SPA |
dc.subject |
Hurto |
SPA |
dc.subject |
Ejecución de obra |
SPA |
dc.subject |
Codensa |
SPA |
dc.title |
Estudio de factibilidad técnica y económica del proceso de ofertas comerciales para la adecuación o nacionalización del servicio eléctrico en la zona oeste de Cundinamarca |
SPA |
dc.type |
Thesis |
US |
dc.description.abstractenglish |
This project studies, the current technical and commercial losses situation and its main
causes from Codensa SA ESP electricity company energy trader at West Cundinamarca. A
solution is proposed to decrease the high commercial losses in the company that allows energy
recovery and billing efficiently through a technical-economics feasibility study with adequate or
normalization of electrical services by reducing the execution time from the notification to
implementation by Codensa SA ESP.
To comply with the electricity regulations and to reduce the energy loss rate of Codensa S.A
ESP, considering the increase in energy losses due to its robbery already generated and
evidenced by the September 2017 indicators from the Management and Losses Control
department, it is proposed the following improvements at the commercial processes, focused on
the resources and time optimization that allow electrical installations adoption and
standardization to identify the specific conditions that the owner must meet and make the
necessary corrections, so that the network operator can provide electric power services as
required by RETIE. |
US |
dc.publisher.department |
Posgrado (Virtual y a Distancia) |
SPA |
dc.publisher.program |
Especialización en Gerencia de Proyectos |
SPA |
dc.type.spa |
Trabajo de Grado |
SPA |
dc.source.bibliographicCitation |
Codensa S.A ESP. (2017). Programa de Bonos Codensa Quinto Tramo. Bogota D.C. |
SPA |
dc.source.bibliographicCitation |
Departamento de Facturación. (2017). Maestro Septiembre sucursal 6000 y 4000 |
SPA |
dc.source.bibliographicCitation |
Departamento Gestion Control Perdidas Cundinamarca. (2017). Puesta a Punto CundinamarcaSeguimiento
Zonas. |
SPA |
dc.source.bibliographicCitation |
Division Operación Integral, Empresa de Energia de Cundinamarca S.A ESP. (2015).
Especificaciones del servicio. |
SPA |
dc.source.bibliographicCitation |
Gerencia Operaciones Comerciales. (2014). Ejecución de Inspecciones Técnicas IN224 |
SPA |
dc.source.bibliographicCitation |
Likinormas, Mi Codensa. (2011). Likinormas. Obtenido de
http://likinormas.micodensa.com/Norma/acometidas_medidores/generalidades_ae/generali
dades_7_1_actualizacion_generalidades |
SPA |
dc.source.bibliographicCitation |
Ministerio de Minas y Energía. (2013). Anexo General del RETIE Resolución 90708 de Agosto
30 de 2013 con sus Ajustes. |
SPA |
dc.source.bibliographicCitation |
Portafolio, R. (30 de Septiembre de 2016). www.portafolio.co. Obtenido de
http:/negocios/fusion-entre-codensa-y-la-eec-500715 |
SPA |
dc.source.bibliographicCitation |
Unidad Operativa Cundinamarca. (2017). Trabajo ejecutado Enero a Septiembre 2017 OI- Zona
Oeste. |
SPA |
dc.source.bibliographicCitation |
WordPress.com. (13 de Octubre de 2009). Conociendolafisica's Blog. Obtenido de
Conociendolafisica's Blog: https://conociendolafisica.wordpress.com/fisica-ii/apuntes-deelectrostatica/antecedentes-historicos-de-la-electricidad/ |
SPA |